Renovations: a guide to planning changes to an existing home.
Kitchens, reconfigured floors, basements, additions and whole-home renovations. This guide covers what is worth thinking through before construction begins. It is general information, not advice about any particular home.
Types of renovation
From a single room to the whole house, and from new finishes to moving walls. The larger the change, the more it helps to plan the whole project before any of it is built.
- Kitchen renovations
- Interior reconfiguration
- Basement development
- Whole-home renovation
- Additions
- Exterior alterations
- Major renovations that need permit documentation
Each carries different requirements. Not every renovation needs the same permits, or any.
Working with a contractor
RVLV designs and documents the renovation; a general contractor builds it. We work closely with general contractors who specialize in renovations and new residential construction, and can recommend one when it helps.
If you already have a contractor you trust, you are welcome to work with them. Either way, we coordinate the design intent and drawings with the construction team so the project is built as it was designed.
RVLV is not the general contractor. Construction pricing and the building contract are between you and your contractor.
Guide
Every renovation starts from what is already there: how the house was built, earlier renovations, where the plumbing and ducts run, and the condition of the structure. Existing drawings help, but most homes need to be measured before design begins.
Older homes in particular can hold surprises, which is one reason to plan for a contingency.
What has to change, what would be good to change, and what can wait. Being clear about priorities early makes it easier to keep the project within a budget, and to decide where money makes the most difference.
How rooms connect, where light comes from, where storage goes and how the household moves through the day. Sometimes a small change, such as moving a doorway, does more than a large one.
Removing or moving walls, adding openings and building up or out all affect the structure. Knowing early which walls carry load shapes the layout, and a structural engineer is involved where the work needs one.
Finishes, cabinetry, fixtures and how they are put together. Materials are chosen for how they look, how they wear and what they cost, and visualization helps test decisions before anything is ordered. Some items have long lead times, so it pays to decide them early.
Requirements depend on the work. Cosmetic updates generally need no permit, while structural changes, new openings in walls and first-time basement development typically need a building permit. Additions and projects that do not meet the land use rules may also need a development permit, and a basement with its own kitchen and bathroom becomes a secondary suite, with requirements of its own.
The City explains when a permit is and is not needed in its guide to home renovations and basements (opens in a new tab). Plumbing, electrical and gas permits are separate trade permits.
Drawings do three jobs: they get the permits, they let contractors price the same project, and they tell the construction team what to build. The clearer they are, the fewer questions and changes there are once work starts.
Questions come up once walls are opened and materials arrive. Where design oversight is part of the scope, we stay involved: answering design questions, reviewing proposed changes and keeping the design intact, while the contractor runs the site and the work.
Not everything has to happen at once. A basement now and a kitchen later can work well, provided the whole is planned first so each phase sets up the next rather than being undone by it.
Measuring and documenting the existing home, planning the layout, interior design and material selection, permit drawings, coordination with engineers and your contractor, and design oversight during construction where it is part of the scope.
Questions
A few common questions.
There is no single renovation price. A kitchen, a partial interior renovation, an addition and a whole-home renovation are very different projects, and costs vary just as widely.
The main drivers are the size of the area, whether structure, plumbing or electrical systems change, the condition of the existing home, finishes and cabinetry, what is found once walls are opened, and the contractor’s pricing. Keeping a contingency is wise in any renovation.
We help define the project, its scope, layout and drawings, clearly enough for a contractor to give meaningful pricing. Design and documentation are quoted separately from construction.
Each stage has its own timing. Smaller interior projects can move relatively quickly; structural renovations, additions and whole-home work take considerably more coordination.
Design. Depends on the scope and how quickly decisions are made; a single room needs far less design time than a whole home.
Permits, if required. Review times are set by the City and change; its guide to home renovations and basements (opens in a new tab) explains when a permit is needed.
Construction. Depends on the scope, material and cabinetry lead times, what is found on site and the contractor’s schedule. Your contractor confirms the construction schedule.
Not always. Cosmetic work such as new finishes or painting generally does not need one. Structural changes, new openings in walls and developing a basement for the first time typically need a building permit, and some projects also need a development permit. Trade permits are separate. We confirm what your project needs as part of the design.
Early, ideally before asking for construction prices. A clear scope, layout and set of drawings lets contractors price the same project and reduces surprises during construction. It still helps if a contractor is already involved.
Either. We work closely with general contractors who specialize in renovations and can introduce one; if you already have a contractor, we work with them instead. Construction pricing and the building contract are always between you and your contractor.
Often, yes. It helps to plan the whole renovation first, so each phase sets up the next rather than being undone later. Some work, such as structure, plumbing and electrical, is usually better done once, and permits apply to each phase as it is built.
The address, photos of the spaces involved, any existing drawings or past permits, and a few lines about what you would like to change. Budget and timing are helpful if you know them, but not necessary to start the conversation.
Planning a renovation? Send us a few photos of the space and a few lines about what you would like to change.